Iskandar Coastal Bridge Jambatan Pantai Iskandar |
|
---|---|
Official name | Iskandar Coastal Bridge |
Carries | Motor vehicles, Pedestrians |
Crosses | Skudai River and Danga River |
Locale | Iskandar Coastal Highway, Johor Bahru |
Maintained by | Iskandar Region Development Authority (IRDA) Malaysian Public Works Department (JKR) Johor Bahru |
Designer | Iskandar Region Development Authority (IRDA) |
Design | arch bridge |
Total length | -- |
Width | -- |
Longest span | -- |
Constructed by | Iskandar Region Development Authority (IRDA) Malaysian Public Works Department (JKR) |
Opened | 2011 |
Iskandar Coastal Bridge is a river bridge in Arch shape near Johor Bahru in Malaysia. It is a second arch bridge in Johor Bahru after Permas Jaya Bridge. The bridge crosses Skudai River and Danga River. The bridge is built to shorten the travel distance between Nusajaya to Johor Bahru town area from --km (estimated) to --km (Estimated).
The construction of the bridge was proposed when a new coastal highway from Danga Bay to Nusajaya, a project part of the Iskandar Development Region (IDR) (now Iskandar Malaysia) was announced on 30 July 2006. Construction began on 2008 and was completed on 2011.